Procurement Software | Purchase Orders
POs against active budgets. Vendor compliance verified at save.
Multi-line, multi-currency, multi-location POs. Budget checked at save against cost-centre, project and period. Vendor W-9 status and taxpayer-number match checked live. Approver chain routes per matrix. Templates pre-fill for repeat purchases.
What the system does
Capability, input, output.
| Capability | Input | Output |
|---|---|---|
| Multi-line PO | Items + quantities + prices + dates | Validated PO ready for approval |
| Multi-currency | Foreign-currency line items + your rate source | Budget-currency equivalent, with the rate kept on the PO |
| Budget check | PO amount + cost-centre / project / period | Allow / block / override path |
| Vendor compliance | Vendor W-9 status and OFAC screen | Live status check at PO save |
| Approval routing | PO + approval matrix | Approver chain with channel preference |
| PO dispatch | Approved PO + vendor contact | Email delivery + portal entry |
-
Multi-line PO
- Input
- Items + quantities + prices + dates
- Output
- Validated PO ready for approval
-
Multi-currency
- Input
- Foreign-currency line items + your rate source
- Output
- Budget-currency equivalent, with the rate kept on the PO
-
Budget check
- Input
- PO amount + cost-centre / project / period
- Output
- Allow / block / override path
-
Vendor compliance
- Input
- Vendor W-9 status and OFAC screen
- Output
- Live status check at PO save
-
Approval routing
- Input
- PO + approval matrix
- Output
- Approver chain with channel preference
-
PO dispatch
- Input
- Approved PO + vendor contact
- Output
- Email delivery + portal entry
Compliance + integrations
POs that respect budget, compliance and audit.
Budget enforcement is the internal control, and the vendor check is what stops a PO being raised against an entity that no longer exists. The audit trail captures every PO from creation to dispatch.
Regulations we work within
-
Internal controls
Budget authority evidenced at the PO rather than asserted in a policy document.
-
OFAC sanctions
Screened before the commitment is made. Liability here does not turn on intent.
-
Audit trail
PO lifecycle preserved, including every amendment and who approved it.
Connects to
- IRS TIN matching Name and number verification
- Xero PO sync
- SAP Business One Native connector
- Vendor portal PO delivery and acceptance
Purchase Orders FAQ
What buyers ask.
Can we have different PO formats for different categories?
Yes. PO templates per category (capex vs opex, services vs goods, domestic vs import). Each template has its own GL coding, approver chain and required fields. Sales rep / requester picks the template; the rest fills in automatically.
What if a PO needs amendment after dispatch?
Amendments (line addition, quantity change, price revision) are versioned. Each amendment routes through approval (often a higher tier than the original). The vendor sees the amendment on the portal; the PO history is preserved.
How does multi-currency work for PO budgets?
The PO amount converts to the budget currency at your configured rate, and the budget check happens in that currency, so a budget does not quietly stretch because the dollar moved. The rate used is kept on the PO, and the FX exposure is tracked separately for treasury rather than being buried in the commitment.
Vendor portal acceptance. What does it cover?
Vendor logs in (OTP) to the portal, sees the PO, confirms acceptance or proposes changes. Acceptance captures the PO version, the vendor confirmation timestamp, and triggers production / dispatch on the vendor side.
More in Procurement Software
Related features
Purchase Requisitions
Pre-PO requisitions with budget check, RFQ trigger, approval routing.
See Purchase RequisitionsGoods Receipt Notes (GRN)
Mobile-first GRN against the PO. Partial receipts, quality holds, rejection workflows.
See Goods Receipt Notes (GRN)Vendor Compliance at PO
W-9 status, taxpayer-number match, OFAC screen and dispute history checked at onboarding and at the PO.
See Vendor Compliance at PO
Raise your next PO with the budget check on screen.
Connect one entity, free. Configure one cost-centre budget. The next PO checks the budget, verifies the vendor live, routes for approval. The full cycle on your data.