Project-based accounting
Each project a sub-entity. Cost, revenue, WIP, sold inventory and unsold stock per project. P&L drilled by project.
RERA-aligned project accounting, milestone billing, sub-contractor compliance and per-project P&L. Multi-project, multi-state, audit-ready.
Per-project P&L, milestone billing, sub-contractor TDS, RERA-aligned escrow, GST at the right rate per booking type. Built for the way construction actually books revenue.
Each project a sub-entity. Cost, revenue, WIP, sold inventory and unsold stock per project. P&L drilled by project.
Demand notes against booking milestones (allotment, foundation, slab, possession). GST applied per stage.
70% RERA escrow account tracked per project. Withdrawals against engineering certificate, audit-ready.
Sub-contractor TDS at 1% (194C), GSTIN validation, PF/ESI for site labour, vendor performance.
Affordable housing (1% / 5%), under-construction (5% / 12%), commercial (18%). Auto-applied per booking.
JDA accounting with land-owner and developer flows. Revenue recognition under Ind AS 115.
RERA mandates that 70% of buyer deposits sit in a project-specific escrow until withdrawn against an engineer's certificate. OneFinOps tracks every receipt against the right escrow, every withdrawal against engineering certification, and produces the audit trail RERA inspectors actually ask for.
Sub-contractors come, go and span sites. Each one has TDS at 1% (194C), GSTIN if registered, PF/ESI for site labour. OneFinOps tracks per sub-contractor cumulative deduction, validates GSTIN at every bill, and runs PF/ESI for the labour pool.
Affordable housing (carpet area up to 60/90 sqm and price up to ₹45L) attracts 1% GST without ITC. Under-construction non-affordable housing attracts 5% without ITC. Commercial and under-construction with ITC option attracts 12%. Completed properties (post-OC) are outside GST. OneFinOps applies the right rate per booking based on project type and booking date, with the right ITC eligibility.
For under-construction properties, GST is on the construction value only, the deemed land value (1/3rd of the consideration) is excluded. OneFinOps applies the 2/3rd rule on each demand note automatically.
Each project registered under RERA carries a 70% escrow rule. OneFinOps auto-routes 70% of buyer receipts to the project escrow, gates withdrawals against engineering certificates, and produces the quarterly progress report. Q1 to Q4 data drafted automatically; audit pack one-click downloadable.
JDA accounting with the land-owner share, developer share, and the deemed barter under GST handled. Revenue recognition under Ind AS 115 / IFRS 15 with the cost-to-cost or output method. The land-owner's GST liability on the area received in lieu is computed and surfaced.
Demand notes generated per milestone (allotment, foundation, slab cast, possession). GST applied per the booking-date rules. Receipts auto-allocated against the latest unpaid demand. Refunds and cancellations handled with credit note + GST reversal.
Each project is a sub-entity. Cost, revenue, WIP and inventory tracked per project. The CFO sees per-project profitability rolled up to entity. Inter-project allocations (head office costs, financing) handled with rules.
A 30-minute walkthrough on your project mix and RERA exposure.