Manufacturing | Supply Chain Management

Shop Floor

Confirmations that reach stock and cost immediately.

What it does

Inside Shop Floor.

The schedule reflects the floor rather than yesterday.

Manufacturing Supply Chain Management, domain 03
01

Operator terminal for confirmation, scrap and downtime

02

Real-time schedule and work centre load visibility

03

Quality checks and hold at operation level

04

Downtime and yield analysis by work centre and shift

Run Shop Floor against your books.

A working session on your structure and a month of your documents.