Vendor Management | Vendor Performance Tracking
On-time delivery rate (GRN date vs PO promised date). Quality acceptance rate (rejected qty vs received qty). Average payment cycle (your timing on their bills). Per vendor, over time. When a vendor's score declines, alternates from your catalog surface so procurement can act before the relationship becomes a single point of failure.
How it works
GRN date vs PO promised date drives on-time. Rejected qty vs received qty drives quality. Both captured automatically at GRN.
Per-vendor scores update monthly with rolling 12-month averages. Trend visible on the vendor record.
When a vendor's composite score declines below threshold, alternates from your catalog (other approved vendors for the same item or category) surface for procurement review.
Performance data feeds annual vendor reviews (a manual SOP at most companies). The data is on the screen; the review is a meeting, not a spreadsheet exercise.
What the system does
| Capability | Input | Output |
|---|---|---|
| On-time delivery | PO promised date + GRN date | On-time % per vendor over time |
| Quality acceptance | Received qty + rejected qty | Quality acceptance % per vendor |
| Payment cycle | Bill date + payment date | Average days-to-pay per vendor |
| Composite performance score | Three components + weights | Score with trend |
| Alternate surfacing | Score decline + item / category | Alternate vendors from catalog |
| Annual review pack | Per-vendor 12-month data | Auto-drafted review pack |
On-time delivery
Quality acceptance
Payment cycle
Composite performance score
Alternate surfacing
Annual review pack
Compliance + integrations
GRN-driven signals. No manual scoring. The audit trail captures every signal and every score.
Regulations we work within
Rule 11(g), Companies Act
Performance score history captured.
Connects to
Vendor Performance Tracking FAQ
Partial deliveries against an open PO score per delivery line. The on-time % is computed at the line level, then aggregated. Vendor delivering 80% on time on day 1 and 20% on day 5 scores 80% on-time.
Where there's no formal QC, GRN rejections (recorded at receipt) drive the quality signal. For services, customer complaints or service-level metrics can be the input. Configurable per category.
When a vendor's score declines below threshold (configurable, default 70/100), the system surfaces other approved vendors for the same item or category. Surfaced based on their performance, capacity (where tracked) and rate.
Yes. Procurement can mark specific orders as force majeure (delays caused by natural events, regulatory hold-ups, etc.). These exclude from the score with reason captured. The override is in the audit trail.
Connect your PO and GRN data, free. The on-time, quality and payment cycle scores compute by morning. The bottom-decile vendors surface with their alternates.